Retubing a waste heat boiler
in a three week shutdown
How hex head ceramic ferrules cut the tubesheet work in an Australian sulfuric acid plant by 67%.
New tubes, new tubesheets and a new hot face, all inside one turnaround.
The ferrules were the part that could give time back
